The short answer: a Canadian-controlled private corporation can earn the enhanced 35% refundable investment tax credit on the first $6 million of qualifying current expenditures, which is up to $2.1 million back as cash in a single year, even in a loss year. Above that $6 million limit, and for corporations that do not qualify for the enhanced rate, the credit is the basic 15%, which for most corporations is non-refundable and only reduces tax owing. Most provinces and territories run their own R&D credit as well, and where one exists it makes your total return larger. How much larger depends on the province.
That is the ceiling and the floor. The rest of this post is about where your own number lands between them, and why.
The maximum federal refund at the enhanced rate is $2.1 million per year: 35% of the first $6 million of qualifying current expenditures. That ceiling is not a default. It is the top of a range, and most claimants land well below it.
Who gets the enhanced 35% refundable rate is the part that trips people up. Canadian-controlled private corporations (CCPCs) qualify. For taxation years beginning on or after December 16, 2024, eligible Canadian public corporations qualify too, a change Bill C-15 brought in. An eligible Canadian public corporation has a class of shares listed on a designated stock exchange, or elected or was designated to be a public corporation, and is not controlled by non-residents.
Corporations that do not qualify, non-resident-controlled corporations for example, generally earn the basic 15% credit, which is non-refundable for most corporations: it reduces tax owing rather than paying out cash. A partnership is not a corporation. Its SR&ED flows through to the partners, and the treatment follows them.
The $2.1 million ceiling itself is conditional. The $6 million expenditure limit phases out as a corporation’s taxable capital grows, and it is shared across associated corporations, so a group of related companies divides one limit, not one each. The CRA’s statement of the federal rates and the expenditure limit is the place to confirm where you sit.
Your refund is the enhanced 35% rate applied to your qualifying expenditure base. The base is where the real work is, because every dollar in it is a dollar you had to spend on eligible work and defend with records.
Say your arm’s-length Canadian contractor invoice is $140,000. Only $112,000 of it enters the base, because contractors count at 80%. A reader who budgets a refund on the full $140,000 is already over by thousands of dollars before the rate is even applied.
There is a hard line on geography. SR&ED must be carried on in Canada for its expenditures to earn the credit. A contract for SR&ED performed outside Canada earns no investment tax credit. The one allowance abroad is the salary or wages of your own employees for SR&ED carried on outside Canada in support of your SR&ED in Canada, capped at 10% of your salary or wages for SR&ED carried on in Canada. The CRA’s guidelines on the eligibility of work set out what the work itself must be.
Take a software company, a CCPC, running a tax year that began in 2025.
Add them: $510,000 + $280,500 + $141,200 = $931,700 qualifying base.
Apply the enhanced 35% rate: $931,700 × 35% = $326,095 federal refund.
That is cash, paid even if the company owes no tax, because it is a CCPC claiming the refundable credit. Provincial credits, where a province runs one, push the combined return higher still. This post names no figure for that part, because the number depends entirely on the province and belongs in a conversation about your own situation. Note that the 55% proxy is doing real work here: strip it out and the base falls by $280,500, and the federal refund falls by nearly $100,000. That is why most claimants elect it.
Yes, within limits. Bill C-15 reinstated capital expenditures for SR&ED for qualifying depreciable property acquired after December 15, 2024, reversing the 2012 removal. This enacted the changes the Fall Economic Statement 2024 proposed, and the Department of Finance announcement is the origin of the current rules.
The treatment is nuanced, and it is worth being honest about that rather than selling it. Only qualifying depreciable property counts. Some acquisitions, used property for example, earn no investment tax credit at all. And enhanced-rate capital ITCs are only partially refundable, unlike current expenditures, which are fully refundable for CCPCs. So a dollar of capital does not behave like a dollar of salary in your refund.
The practical consequence: do not model a capital refund yourself from a rate. Keep the capital question high-level until you have run the specific property past someone who can read the acquisition date, the property type, and the refundability split together. One wrong assumption here changes the number materially.
One date trap to avoid. Capital eligibility is for property acquired after December 15, 2024. The enhanced-rate and public-corporation changes apply to taxation years beginning on or after December 16, 2024. Two different dates, one day apart. Do not merge them.
Two things, both required, and the refund is zero without them. First, the work has to aim at the advancement of scientific knowledge or a technological advancement. Second, it has to be a systematic investigation or search carried out by experiment or analysis to resolve a scientific or technological uncertainty. A merely systematic approach to routine work does not qualify.
Success is not one of the requirements. Failed or abandoned work can still qualify if it met the test, because the incentive is for the search, not the outcome. That is the single most expensive misconception in this program: teams write off their best claim because the project did not ship.
Two things that are not eligible, so you do not count them into your base:
And the deadline is hard. A corporation has 18 months after its fiscal year-end to file. A December 31, 2024 year-end files by June 30, 2026. The CRA’s filing requirements policy states what a complete claim must contain. Miss the date and the claim is gone.
How much you get back from SR&ED comes down to one rate on one base, bounded by one limit. The rate is the enhanced 35% refundable credit for qualifying corporations, the base is your eligible salaries plus the 55% proxy plus materials consumed or transformed plus contractors at 80%, and the limit is the first $6 million of current expenditures, worth up to $2.1 million in cash. Provincial credits make the total larger where they exist. The work has to meet the two-part test, the costs have to be incurred in Canada, and the claim has to be filed within 18 months. Get those right and the number takes care of itself.
The $6 million expenditure limit applies per taxation year, so a new year brings a fresh limit. But it phases out as taxable capital grows, and associated corporations share one limit between them rather than each claiming the full amount. A group’s planning should account for both before assuming a clean $6 million.
The CRA aims to process a refundable claim accepted as filed within 60 calendar days, and a claim selected for review within 180 days of a complete filing. "Aims" is an honest hedge here: these are targets, not guarantees, and a review genuinely takes the longer window.
Not Form T661. T661 captures the project information and calculates your expenditures and qualified expenditures. The investment tax credit is calculated on a separate schedule: corporations use Schedule T2SCH31, individuals use Form T2038(IND). Treating T661 as the credit form is a common and avoidable confusion.
Yes. Failed or abandoned work can still qualify, because the program rewards the systematic attempt to resolve a technological uncertainty, not commercial success. If the work met the two-part eligibility test, the outcome does not disqualify it. Many strong claims come from projects that never shipped.
The 80% rule is specific to arm’s-length Canadian contractors. Non-arm’s-length contractor costs are handled differently on the form, reported on their own line rather than line 340. If a related party does your development work, the calculation changes, and it is worth confirming the treatment before you budget a refund on it.
The CRA allowed $4.6 billion in investment tax credits on 23,677 claims processed in the 2025-26 fiscal year, per the program’s annual statistics. It is the Government of Canada’s largest program supporting business R&D, which is why getting the base and the deadline right matters.
This article is general information, not tax advice. Tax figures depend on your corporation type, province, and taxation year.
Do you have a SRED question? Planning for the future or perhaps you want to know how much your claim might be? Don’t worry, our CPA is always ready to answer any question. Get a SRED expert in your corner.
Have a question? We’d love to help. If you don’t have a SR&ED expert in your corner, doesn’t it make sense to have one?